Move to the cloud with confidence and run cloud-native operations that reduce cost, improve availability, and keep data compliant with EU rules. We combine strategic planning, secure migrations, and continuous cloud operations (SRE & DevOps) for AWS, Azure and Google Cloud — tailored to European requirements and data-residency expectations.
Cloud Management Dashboard
Many migrations fail due to poor planning or hidden costs. Our process reduces risk by combining architecture validation, compliance controls (GDPR & data residency), test cutovers, and SRE-style runbooks. Whether you're shifting VMs, refactoring apps to Kubernetes, or adopting multi-cloud, we deliver measurable results: faster time-to-market, lower OPEX, and safer operations.
Cloud suitability, TCO, and migration roadmap.
Minimal downtime migrations with tested rollback plans.
Data residency, encryption, IAM, and GDPR controls.
24/7 monitoring, incident response, and SRE runbooks.
Rightsizing, reserved instances, and billing governance.
Cluster ops, autoscaling, CI/CD pipelines.
RPO/RTO planning and tested recovery.
Microservices, serverless patterns, and cloud APIs.
Our migration practice covers every phase: discovery, dependency mapping, pilot, cutover, and post-migration optimization. We perform agentless/server-based discovery to map application dependencies, estimate costs, and mitigate risks. For each migration we produce a rollback plan, runbook, and acceptance tests so cutovers are predictable and auditable.
After migration, we operate your cloud with SRE principles: SLIs, SLOs, error budgets, automated remediation, and continuous improvement. Our 24/7 cloud operations team handles incident triage, patching, autoscaling rules, capacity planning, and security scanning. You get measurable SLAs, monthly SLO reports, and a single pane of glass for cloud health.
We design cloud environments to align with GDPR and regional data residency needs (e.g., EU-only data storage) and implement security controls such as encryption-at-rest/in-transit, role-based access control (RBAC), secure key management, and SIEM integration. We also produce audit-ready documentation for compliance reviews.
Cloud cost management is continuous — we apply rightsizing, reserved instance strategies, autoscaling policies, and per-team billing to eliminate waste. Our FinOps reports show actionable savings and forecast monthly spend to align cloud bills with business budgets.
Monthly cost reports · rightsizing recommendations · tagging and chargeback setup · reserved/spot instance strategy.
We run Kubernetes (EKS/AKS/GKE) and container platforms with best practices: cluster security, CI/CD pipelines, automated scaling, and observability stacks (metrics + tracing + logs). Our approach reduces developer friction and improves deployment velocity while maintaining production stability.
Cluster ops · GitOps pipelines · Service mesh advisory · Canary & blue/green deployments.
We design backup and DR strategies with clearly defined RPOs and RTOs, automated backups, cross-region replication, and quarterly recovery tests. DR plans are tested end-to-end and documented for auditors and execs.
Inventory, app dependency mapping, cost model.
Architecture, compliance plan, migration waves.
Proof-of-concept migration and performance labs.
Production migration, security hardening, validate SLAs.
Live SRE ops, cost control, quarterly reviews.
We're vendor-agnostic — we'll operate and optimize your existing infrastructure or propose best-fit solutions.
One-time project cost based on number of apps/VMs.
Monthly fee based on managed resources and SLOs.
Migration project then managed operations.
We helped a SaaS platform migrate from a single-region setup to a multi-region cloud architecture. Our approach included lift+replatform of existing services and implementation of CI/CD pipelines. The results were impressive: 30% lower infrastructure costs, 40% faster deployments, and GDPR-compliant multi-region failover.
Performance Improvement Chart
Download our comprehensive checklist to evaluate your cloud migration readiness and estimate potential costs.
Small migrations (10–20 VMs/apps) typically take 2–6 weeks; medium/large projects are scoped after a discovery phase. Exact timelines depend on complexity, testing, parallelism, and compliance requirements.
We design data flows, apply encryption, use EU-region storage where required, produce Data Protection Impact Assessments (DPIA), and provide audit-ready documentation.
Yes — our FinOps practice produces rightsizing, reserved-instance strategies, tagging, and governance to reduce waste.
Yes — we operate EKS/AKS/GKE clusters with CI/CD, monitoring, and security best practices.
Book your free cloud assessment now and receive a 90-day improvement plan. No obligation — just a clear path to safer, cheaper, faster cloud operations.
Or call our EU line: +44 20 1234 5678 — local numbers available per country